久久精品网站亚洲另类_首页 国产 欧美_香蕉视频免费在线播放_周妍希浴缸洗澡未删视频_日韩理论在线观看_国产特级特黄毛片视频_狠狠干人人干三级青草成人_欧美亚洲中文精品高清老_www日本中文字幕_亚洲色图资源在线

Bolt Monitoring System Deployed in Major Subway

Release Time: 2021-05-12 11:02:45

Rail joints are an important yet weak component in railway tracks because of the large impact and wheel-rail contact forces. Every train passage contributes to the deterioration of rail joints, causing visible (e.g., battered rails) and invisible (e.g., loose bolts) damages. The invisible damage cannot be detected by the commonly performed visual inspection, which is labor intensive, unreliable, intrusive, and unsafe. The impact of the train vibration during the daily running will loosen or break the fasteners, which will further lead to the loss or damage of the fasteners, which will seriously affect the train running safety, or even cause a train derailment accident. Therefore, the condition detection of the railway fastening system, looseness or absence, is an important task in railway maintenance.

Bolt Monitoring System Deployed in Major Subway(圖1)

Our bolt monitoring system was successfully deployed in a major subway system, enhancing the inspection and monitoring process by making it safer, inexpensive and less time-consuming.

 Bolt Monitoring System Deployed in Major Subway(圖2)

For this project, hundreds of wireless bolt loosening sensors (model SA210) are installed on critical bolts of subway turnouts. All sensor data is transmitted to the bolt monitoring system via the wireless gateway (model GU100P).

 Bolt Monitoring System Deployed in Major Subway(圖3)

Each sensor is designed for ultra-low power consumption and has a battery life of more than 10 years for normal usage.

Bolt Monitoring System Deployed in Major Subway(圖4)

Our remote bolt monitoring system increases the safety and longevity of subway, reduce downtime by optimizing operation and maintenance activities, and help drive smarter, faster business decisions for subway operators.